The City of Waterloo has completed a first draft of a Transportation Master Plan (TMP) to establish an implementation strategy for a coordinated and integrated transportation system that will guide the decision making processes for the next 20 years or more. The study followed the requirement of the Environmental Assessment process and aligned strategically with the City of Waterloo “2007-2010 Strategic Plan” and the transportation objectives of the Official Plan review.
Master Plan Strategy
As part of the master plan study, staff reviewed our existing transportation system and developed a strategy for improving the way we move people and goods through and around the city. The function and layout of the city has changed in recent years and the transportation system needs to align with this by moving towards a more sustainable transportation system – one that is less dependent on the auto.
Consultants IBI Group in conjunction with Stantec Consulting Limited have been retained by the city to develop this master plan.
Master Plan Objectives
The objectives of this study were to:
-
Develop a guiding transportation policy document
-
Provide greater travel options
-
Describe how to develop a city that is less reliant on the autoD
-
Describe how to develop an integrated system that supports Regional transit
Public Consultation Process
Engaging the general public was a major component of this study. Individuals, organizations and groups were encouraged to provide comments on this master plan study. The workplan included:
-
Three Public Information Centres
-
Presentations to City of Waterloo Advisory Committees to Council
-
Mayor and Council Interviews
-
Stakeholder Outreach Meetings and Workshops, Including Presentations to Neighbourhood Associations
-
Two Lunch and Learn Sessions with City Staff
-
Key Stakeholder Workshop
If you are interested in this study or have any questions please contact either of the following project managers. In addition a copy of the June 14, 2010 Report to Council presenting the first draft of the Plan is attached below, as well as a copy of the draft plan dated June, 2010.
| Chris Hodgson B.Eng. |
Don Drackley |
| Capital Projects & Services |
IBI Group, |
| City of Waterloo |
5th Floor, 230 Richmond St. W. |
| 265 Lexington Court, Waterloo ON. N2J 4A8 |
Toronto ON. M5V 1V6 |
| Tel: 519-886-2310 x304 |
Tel: 519-620-8898 |
| Fax: 519-886-5788 |
Fax: 416-596-0644 |
| Email: |
Email: | |
|